Own foundry
5-ton dual induction furnaces, a 20-ton automatic sand reclamation line and in-house heat treatment.
Replacement wear parts for crushers, screens and vertical mills
WEAR PARTS FOUNDRY · HENAN, CHINA · SINCE 2018
Cast, heat-treated and machined in our own foundry — matched to your equipment model and part number, with inspection records for every order.
INSIDE THE FOUNDRY




WHY BROK
5-ton dual induction furnaces, a 20-ton automatic sand reclamation line and in-house heat treatment.
Mn13Cr2 and Mn18Cr2 manganese steel; melt chemistry is checked by spectrometry before pouring.
Vertical turning and milling control mounting faces, fits, holes and other critical dimensions.
Chemistry, hardness, dimensional and NDT records can be supplied to match your acceptance criteria.
MANUFACTURING

01 / MELTING
Production follows confirmed order and process requirements.

02 / MOLDING
Production follows confirmed order and process requirements.

03 / FINISHING
Production follows confirmed order and process requirements.

04 / DELIVERY
Quality documents, packing and container loading are managed around your confirmed order.
QUALITY CONTROL
Four inspection gates connect material, process and final-delivery evidence to the specific part and order.
Material confirmation — Inspection results remain linked to product and order records.
Process inspection — Inspection results remain linked to product and order records.
Final inspection — Inspection results remain linked to product and order records.
Document traceability — Inspection results remain linked to product and order records.
The previous public certificate expired on 15 October 2026. Renewal documents are pending verification.




HOW TO GET A QUOTE
Equipment model, part name or number — plus a drawing or nameplate photo if you have one.
Material, drawing and inspection requirements are aligned before production.
Price and lead time are confirmed for your request.
Quality records, export packing and container loading per order.